Search results

Jump to navigation Jump to search
  • ...o Colombo (UNIBG), Francesco Carlo Massa (UNIBG), Jean-Baptiste Chapelier (ONERA) | organisation=University of Bergamo (UNIBG), ONERA
    399 bytes (42 words) - 11:51, 27 February 2023
  • ...o Colombo (UNIBG), Francesco Carlo Massa (UNIBG), Jean-Baptiste Chapelier (ONERA) | organisation=University of Bergamo (UNIBG), ONERA
    2 KB (282 words) - 11:51, 27 February 2023
  • ...ssa, Jean-Baptiste Chapelier || Università degli studi di Bergamo (UniBG), ONERA
    673 bytes (88 words) - 11:53, 27 February 2023
  • ...o Colombo (UNIBG), Francesco Carlo Massa (UNIBG), Jean-Baptiste Chapelier (ONERA) |organisation=University of Bergamo (UNIBG), ONERA
    3 KB (421 words) - 11:37, 27 February 2023
  • ...lly, for purpose of validation of CFD methodologies, in the NWG DLR and F1 ONERA wind tunnels, has been considered in the E. U. funded project ECARP [8] and ...lly, for purpose of validation of CFD methodologies, in the NWG DLR and F1 ONERA wind tunnels, has been considered in the E. U. funded project ECARP [8] and
    6 KB (836 words) - 12:58, 12 February 2017
  • ...flow around an inclined spheroid have been conducted in the NWG DLR and F1 ONERA wind tunnels with the aim to provide data for validation of numerical metho
    2 KB (329 words) - 12:59, 12 February 2017
  • ...ailing separation bubble was too large. The conclusion was that &ldquo;the ONERA results demonstrate that a transition effect can be larger that the effect ...ress profiles. Squares, expt F1; circles expt F2; solid line, SAAB; dotted ONERA; dashed, BAe; chain-dotted, Helsinki. Reproduced with permission. </center>
    8 KB (1,195 words) - 19:42, 11 February 2017
  • ONERA/DAAP. [[UFR_3-32_Description#table1|Table 1]], the numerical simulations of ONERA/DAAP (DES and LES) and SOTON (LES),
    10 KB (1,497 words) - 13:45, 12 February 2017
  • ...rmed at the NWG DLR wind tunnel and, at higher Reynolds numbers, at the F1 ONERA wind tunnel. The ONERA F1 is a pressurised (maximum pressure is 4 bar) low speed wind tunnel with
    18 KB (2,503 words) - 12:58, 12 February 2017
  • ...Massa (UNIBG), Michael Leschziner (ICL/ERCOFTAC), Jean-Baptiste Chapelier (ONERA) | organisation=University of Bergamo (UNIBG), ICL (Imperial College London), ONERA
    11 KB (1,671 words) - 11:55, 27 February 2023
  • ...rche Scientifique UM 7343, (**)&nbsp;University of Southampton, (***)&nbsp;ONERA/DAAP, Meudon, France
    3 KB (443 words) - 13:46, 12 February 2017
  • ...rche Scientifique UM 7343, (**)&nbsp;University of Southampton, (***)&nbsp;ONERA/DAAP, Meudon, France
    4 KB (522 words) - 13:46, 12 February 2017
  • ...Massa (UNIBG), Michael Leschziner (ICL/ERCOFTAC), Jean-Baptiste Chapelier (ONERA) | organisation=University of Bergamo (UNIBG), ICL (Imperial College London), ONERA
    8 KB (1,196 words) - 11:38, 27 February 2023
  • ...de la Recherche Scientifique UM 7343,&nbsp;University of Southampton,&nbsp;ONERA/DAAP
    4 KB (499 words) - 16:00, 17 February 2023
  • ...Massa (UNIBG), Michael Leschziner (ICL/ERCOFTAC), Jean-Baptiste Chapelier (ONERA) | organisation=University of Bergamo (UNIBG), ICL (Imperial College London), ONERA
    11 KB (1,631 words) - 11:47, 27 February 2023
  • ...sais à la soufflerie F2 sur les profils A et B&rdquo;, RSF No 74/1685 AYG, ONERA.
    4 KB (522 words) - 19:43, 11 February 2017
  • ...Massa (UNIBG), Michael Leschziner (ICL/ERCOFTAC), Jean-Baptiste Chapelier (ONERA) |organisation=University of Bergamo (UNIBG), ICL (Imperial College London), ONERA
    9 KB (1,371 words) - 11:44, 27 February 2023
  • ...ct &ldquo;Opération Décrochage&rdquo; driven by Aerospatiale and including ONERA, CERT and IMFT as partners. A complete experimental database was compiled ( ...esigned in 1986. The UFR corresponds precisely to one case measured in the ONERA F2 tunnel at M=0.15 and Re<sub>c</sub>=2.1x10<sup>6</sup> measured by Gleyz
    26 KB (3,576 words) - 19:42, 11 February 2017
  • ...ocated at 1.2 mm from the wall. Left PIV (IUSTI), right: SDES computation (ONERA). ...rche Scientifique UM 7343, (**)&nbsp;University of Southampton, (***)&nbsp;ONERA/DAAP, Meudon, France
    13 KB (1,855 words) - 13:45, 12 February 2017
  • ...en vue de la validation du code canai.&rdquo; Technical Report 92/7078 Ay, ONERA, Fevrier 1991
    4 KB (565 words) - 12:48, 12 February 2017
View (previous 20 | ) (20 | 50 | 100 | 250 | 500)