Chemical, Process, Thermal and Nuclear Safety: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
|- style="background-color:gold;" | |- style="background-color:gold;" | ||
! 3-01 | ! 3-01 | ||
| [[Buoyancy-opposed wall jet]] || [[Magnox Electric]] | | [[Buoyancy-opposed wall jet]] || [[Magnox Electric|Jeremy Noyce]] | ||
| Magnox Electric | |||
|- style="background-color:silver;" | |- style="background-color:silver;" | ||
! 3-02 | ! 3-02 |
Revision as of 10:30, 15 July 2009
AC | Application Challenges | Contributor | Organisation |
---|---|---|---|
3-01 | Buoyancy-opposed wall jet | Jeremy Noyce | Magnox Electric |
3-02 | Induced flow in a T-junction | EDF - R&D Division | |
3-03 | Cyclone separator | Fluent Europe Ltd | |
3-08 | Spray evaporation in turbulent flow | Martin-Luther-Universitat Halle-Wittenberg | |
3-10 | Combining/dividing flow in Y junction | Rolls-Royce Marine Power, Engineering & Technology Division | |
3-11 | Downward flow in a heated annulus | British Energy |